{"id":12054,"date":"2024-12-02T18:18:42","date_gmt":"2024-12-02T21:18:42","guid":{"rendered":"https:\/\/www.portocentral.com.br\/?p=12054"},"modified":"2024-12-03T18:15:17","modified_gmt":"2024-12-03T21:15:17","slug":"porto-central-inicia-obras-da-fase-1-em-presidente-kennedy-es","status":"publish","type":"post","link":"https:\/\/www.portocentral.com.br\/en\/blog\/porto-central-inicia-obras-da-fase-1-em-presidente-kennedy-es\/","title":{"rendered":"Porto Central begins construction of PHASE 1 in Presidente Kennedy (ES)"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">Porto Central, in Presidente Kennedy (ES), will begin the construction of the port on December 4,\n2024. With an initial investment of approximately R$2.6 billion and all environmental licenses\nissued by the Brazilian Institute of the Environment and Renewable Natural Resources (IBAMA) -\nLP 498\/2014 and LI 1436\/2023 -, Phase 1 will include the construction of the port infrastructure\nnecessary to accommodate a deep-water liquid bulk terminal. The terminal will be dedicated to\nthe transshipment of crude oil between ships (ship-to-ship) in a protected area, offering safety\nand efficiency for operations with large vessels, such as Very Large Crude Carriers (VLCCs).\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The first intervention will be the removal of vegetation, with the removal of approximately 65\nhectares, part of a total of 2,000 hectares licensed for the project. To reach this stage,\ncompensatory measures have been implemented since 2020, such as the planting of more than\n12,000 native seedlings in the forest compensation areas, with the goal of reaching 100,000\nseedlings planted throughout Phase 1. The rescue of terrestrial fauna, which began in November\n2024, is part of the environmental plan and includes partnerships with institutions such as the\nInstituto Federal do Esp\u00edrito Santo (IFES), Alegre campus, and the relocation of species to\nprotected areas.\u00a0<\/span><\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-large wp-image-12055\" src=\"http:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/EN-Vegetation-Suppression.jpg\" alt=\"Supress\u00e3o Vegetal Fase 1\" width=\"1024\" height=\"672\" srcset=\"https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/EN-Vegetation-Suppression.jpg 2160w, https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/EN-Vegetation-Suppression-1024x664.jpg 1024w, https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/EN-Vegetation-Suppression-768x498.jpg 768w, https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/EN-Vegetation-Suppression-1536x996.jpg 1536w, https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/EN-Vegetation-Suppression-2048x1327.jpg 2048w, https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/EN-Vegetation-Suppression-640x415.jpg 640w, https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/EN-Vegetation-Suppression-400x259.jpg 400w, https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/EN-Vegetation-Suppression-367x238.jpg 367w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p><span style=\"font-weight: 400;\">The schedule for the first phase of the port foresees completion of the works by mid-2027, with\noperations starting in December of the same year. The stages include the completion of\nvegetation removal, followed by civil works for earthmoving, and implementation of the\nconstruction site. Also planned are the production, transportation, and storage of rocks for the\nsouth breakwater, the installation of the concrete element manufacturing plant, and the dredging\nof the access channel. A highlight of this phase is the adoption of the Adaptive Dredging Program\n(PGDA), a pioneering initiative in Brazil, which uses high technology to minimize environmental\nimpacts during maritime works.\u00a0<\/span><\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-large wp-image-12056\" src=\"http:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/Screenshot-2024-12-02-at-16.48.01.png\" alt=\"Fase 1 destacada \" width=\"1024\" height=\"573\" srcset=\"https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/Screenshot-2024-12-02-at-16.48.01.png 2154w, https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/Screenshot-2024-12-02-at-16.48.01-1024x573.png 1024w, https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/Screenshot-2024-12-02-at-16.48.01-768x430.png 768w, https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/Screenshot-2024-12-02-at-16.48.01-1536x860.png 1536w, https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/Screenshot-2024-12-02-at-16.48.01-2048x1147.png 2048w, https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/Screenshot-2024-12-02-at-16.48.01-640x358.png 640w, https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/Screenshot-2024-12-02-at-16.48.01-400x224.png 400w, https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/Screenshot-2024-12-02-at-16.48.01-367x205.png 367w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p><span style=\"font-weight: 400;\">At the peak of Phase 1 construction, up to 1,295 direct workers are expected to be employed,\nwith the goal of 70% being local labor. Priority is given to suppliers and workers from the port's\nareas of influence, and the project has strongly discouraged workers from other regions from\nmigrating in search of opportunities.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Recognized as a structural and priority project in Esp\u00edrito Santo and part of the Federal\nGovernment's Growth Acceleration Program (PAC), Porto Central has a strategic location in the\ncenter of the Brazilian coast, close to the Pre-salt basins, the main markets and the main highways and railways, which places the project in a prominent position on the national scene.\n\"Porto Central will be a multipurpose port complex, with a strong focus on sustainability, which\nwill be able to meet the most optimistic demands for economic growth in Brazil, strengthening\nnational competitiveness, generating jobs and income, boosting opportunities and new\nbusinesses, and improving the country's position in the port infrastructure ranking in relation to\nother countries in the world\", stated CEO Salom\u00e3o Fadlalah. <\/span><span style=\"font-weight: 400;\">sustentabilidade, que ser\u00e1 capaz de atender \u00e0s demandas mais otimistas de crescimento econ\u00f4mico do Brasil, fortalecendo a competitividade nacional, gerando empregos e renda, impulsionando oportunidades e novos neg\u00f3cios e melhorando a posi\u00e7\u00e3o do pa\u00eds no ranking de infraestrutura portu\u00e1ria em rela\u00e7\u00e3o a outros pa\u00edses no mundo\u201d, declarou o CEO Salom\u00e3o Fadlalah.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">According to Porto Central's management, the project is strategically positioned in the national\nlogistics context, meeting the growing demand for modern and efficient port infrastructure. \"We\nare ready to contribute to the development of the Brazilian port sector and the growing demand\nfor oil exports, offering additional capacity for oil exports and reducing logistics costs\", stated\ndirector Angelo Santos.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Another distinguishing feature is its integration with the national logistics network. In addition to\nthe already consolidated road transport network, there are projects to connect the port to the\nEF-118 Railway, which will link Esp\u00edrito Santo to the Midwest with the existing EFVM and FCA\nrailways, and to the EF-352, planned to expand the routes for the flow of agricultural and\nindustrial cargo.\u00a0<\/span><\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-large wp-image-12057\" src=\"http:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/EN-Location-of-Porto-Central.jpg\" alt=\"PIB e Hinterl\u00e2ndia\" width=\"1024\" height=\"973\" srcset=\"https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/EN-Location-of-Porto-Central.jpg 1135w, https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/EN-Location-of-Porto-Central-1024x974.jpg 1024w, https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/EN-Location-of-Porto-Central-768x731.jpg 768w, https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/EN-Location-of-Porto-Central-640x609.jpg 640w, https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/EN-Location-of-Porto-Central-400x381.jpg 400w, https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/EN-Location-of-Porto-Central-367x349.jpg 367w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p><span style=\"font-weight: 400;\">With construction work about to begin, Porto Central is already planning the next steps to\nconsolidate its strategic position in the Brazilian port sector. According to Commercial Manager\nJessica Chan, in addition to the crude oil transshipment made possible for Phase 1, the port\ncomplex is structured and licensed to allow for future expansions and diversification of\noperations. \u201cWe are already in negotiations and with the technical studies required for the\ndevelopment of the next terminals, in particular the shipyard for decommissioning and\nsustainable recycling of ships in partnership with M.A.R.S and a container handling hub that will\nbe able to receive ships of up to 25,000 TEUs.\u201d\u00a0<\/span><\/p>\n<p><b>Multipurpose model\u00a0<\/b><\/p>\n<p><span style=\"font-weight: 400;\">The masterplan covers an area of 2,000 hectares, with water depths of up to 25 meters, and 54\nberths intended for operations that go beyond the oil and derivatives sector. The project was\ndesigned to accommodate multipurpose terminals and industries, including the handling and\nstorage of liquid bulk (such as bunker and fuels), solid bulk, grains, fertilizers, minerals,\ncontainers, general cargo, natural gas, offshore support, and shipyards.\u00a0<\/span><\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-large wp-image-12058\" src=\"http:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/Side-view-scaled.jpg\" alt=\"Projeto multiprop\u00f3sito\" width=\"1024\" height=\"577\" srcset=\"https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/Side-view-scaled.jpg 2560w, https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/Side-view-1024x576.jpg 1024w, https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/Side-view-768x432.jpg 768w, https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/Side-view-1536x864.jpg 1536w, https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/Side-view-2048x1152.jpg 2048w, https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/Side-view-640x360.jpg 640w, https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/Side-view-400x225.jpg 400w, https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/Side-view-367x206.jpg 367w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p><span style=\"font-weight: 400;\">With a focus on sustainability, Porto Central is positioned as a strategic infrastructure to integrate\nrenewable energy operations, such as solar and offshore wind farms, and to support\ndecarbonization and energy transition strategies, including hydrogen-related projects. Its development will be implemented in phases, aligned with market demands and customer needs,\nensuring flexibility, efficiency, and strategic alignment with the growth of the project.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The privileged location in the center of the Brazilian coast, in deep waters, close to the major\nproduction centers in Brazil and a market with more than 100 million consumers, consolidates the\ncomplex as a global hub for various businesses, capable of receiving the largest ships in the\nworld. This places the project at the forefront, standing out as one of the largest and most\nimportant port projects in the country at the moment. \u201cIt will contribute to expanding national\naccess to a quality and efficient port infrastructure, providing logistical excellence and higher\ncompetitiveness for the country\", points out Angelo.\u00a0<\/span><\/p>\n<p><b>Transparency\u00a0<\/b><\/p>\n<p><span style=\"font-weight: 400;\">Porto Central's human rights policy includes initiatives such as equal opportunities, combating\nchild and slave labor, and social inclusion. In addition, the company has promoted ongoing\ndialogue with local communities, establishing programs to mitigate risks and strengthen\nrelationships based on transparency and respect.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The company provides a reporting channel for employees, service providers, and the local\ncommunity. Operated by a specialized and independent company, the service operates 24 hours a\nday, 7 days a week, ensuring anonymity, confidentiality, and protection against retaliation. Access\ncan be made by calling 0800 591 2683 or via the website:\nhttps:\/\/www.contatoseguro.com.br\/pt\/portocentral\/ <strong>0800 591 2683<\/strong> ou pela p\u00e1gina de web: <\/span><a href=\"https:\/\/www.contatoseguro.com.br\/pt\/portocentral\/\"><span style=\"font-weight: 400;\">https:\/\/www.contatoseguro.com.br\/pt\/portocentral\/<\/span><\/a><span style=\"font-weight: 400;\">.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The Porto Central website (https:\/\/www.portocentral.com.br\/fale-conosco\/) also has a Contact Us\nsection, where citizens can register questions, suggestions, or comments related to the company,\nexpanding communication channels with the community and reinforcing the commitment to\ntransparency and open dialogue. <\/span><span style=\"font-weight: 400;\">tamb\u00e9m conta com uma se\u00e7\u00e3o de <a href=\"https:\/\/www.portocentral.com.br\/en\/fale-conosco\/\">Contact Us<\/a>, onde os cidad\u00e3os podem registrar d\u00favidas, sugest\u00f5es ou coment\u00e1rios relacionados ao empreendimento, ampliando os canais de comunica\u00e7\u00e3o com a comunidade e refor\u00e7ando o compromisso com a transpar\u00eancia e o di\u00e1logo aberto.<\/span><\/p>\n<p><strong>Confira o v\u00eddeo sobre a FASE 1<\/strong><\/p>\n<p>&nbsp;<\/p>\n<div class=\"ose-youtube ose-uid-2d3015b3c268afc2fdd6f7838e3e34d2 ose-embedpress-responsive\" style=\"width:600px; height:300px; max-height:300px; max-width:100%; display:inline-block;\"><iframe allowfullscreen title=\"Porto Central begins construction of PHASE 1 in Presidente Kennedy (ES)\" width=\"600\" height=\"300\" src=\"https:\/\/www.youtube.com\/embed\/lWUkIwu4CuI?feature=oembed&color=red&rel=0&controls=1&start=&end=&fs=0&iv_load_policy=0&autoplay=0&modestbranding=0&cc_load_policy=1\" frameborder=\"0\" allow=\"accelerometer; encrypted-media;accelerometer;autoplay;clipboard-write;gyroscope;picture-in-picture clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\"><\/iframe><\/div>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>O Porto Central, em Presidente Kennedy (ES), dar\u00e1 in\u00edcio \u00e0 execu\u00e7\u00e3o do projeto no pr\u00f3ximo dia 4 de dezembro de 2024. Com um investimento inicial de cerca de R$ 2,6 bilh\u00f5es e todas as licen\u00e7as ambientais emitidas pelo Instituto Brasileiro do Meio Ambiente e dos Recursos Naturais Renov\u00e1veis (Ibama) &#8211; LP 498\/2014 e LI 1436\/2023 [&hellip;]<\/p>","protected":false},"author":2,"featured_media":12063,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[61,59,62,3],"tags":[95,94,81,96,56],"acf":[],"featured_image_src":{"landsacpe":["https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/Screenshot-2024-12-02-at-17.21.06-1140x445.png",1140,445,true],"list":["https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/Screenshot-2024-12-02-at-17.21.06-463x348.png",463,348,true],"medium":["https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/Screenshot-2024-12-02-at-17.21.06-300x166.png",300,166,true],"full":["https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/Screenshot-2024-12-02-at-17.21.06.png",2078,1148,false]},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v22.4 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Porto Central inicia obras da FASE 1 em Presidente Kennedy (ES) - Porto Central<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.portocentral.com.br\/en\/blog\/porto-central-inicia-obras-da-fase-1-em-presidente-kennedy-es\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Porto Central inicia obras da FASE 1 em Presidente Kennedy (ES) - Porto Central\" \/>\n<meta property=\"og:description\" content=\"O Porto Central, em Presidente Kennedy (ES), dar\u00e1 in\u00edcio \u00e0 execu\u00e7\u00e3o do projeto no pr\u00f3ximo dia 4 de dezembro de 2024. Com um investimento inicial de cerca de R$ 2,6 bilh\u00f5es e todas as licen\u00e7as ambientais emitidas pelo Instituto Brasileiro do Meio Ambiente e dos Recursos Naturais Renov\u00e1veis (Ibama) &#8211; LP 498\/2014 e LI 1436\/2023 [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.portocentral.com.br\/en\/blog\/porto-central-inicia-obras-da-fase-1-em-presidente-kennedy-es\/\" \/>\n<meta property=\"og:site_name\" content=\"Porto Central\" \/>\n<meta property=\"article:published_time\" content=\"2024-12-02T21:18:42+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-12-03T21:15:17+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/Screenshot-2024-12-02-at-17.21.06-1024x566.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"566\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Dani Klein\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Dani Klein\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.portocentral.com.br\/blog\/porto-central-inicia-obras-da-fase-1-em-presidente-kennedy-es\/\",\"url\":\"https:\/\/www.portocentral.com.br\/blog\/porto-central-inicia-obras-da-fase-1-em-presidente-kennedy-es\/\",\"name\":\"Porto Central inicia obras da FASE 1 em Presidente Kennedy (ES) - Porto Central\",\"isPartOf\":{\"@id\":\"https:\/\/www.portocentral.com.br\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.portocentral.com.br\/blog\/porto-central-inicia-obras-da-fase-1-em-presidente-kennedy-es\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.portocentral.com.br\/blog\/porto-central-inicia-obras-da-fase-1-em-presidente-kennedy-es\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/Screenshot-2024-12-02-at-17.21.06.png\",\"datePublished\":\"2024-12-02T21:18:42+00:00\",\"dateModified\":\"2024-12-03T21:15:17+00:00\",\"author\":{\"@id\":\"https:\/\/www.portocentral.com.br\/#\/schema\/person\/9c74e456aa9f17c1556873d18fe8352d\"},\"breadcrumb\":{\"@id\":\"https:\/\/www.portocentral.com.br\/blog\/porto-central-inicia-obras-da-fase-1-em-presidente-kennedy-es\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.portocentral.com.br\/blog\/porto-central-inicia-obras-da-fase-1-em-presidente-kennedy-es\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.portocentral.com.br\/blog\/porto-central-inicia-obras-da-fase-1-em-presidente-kennedy-es\/#primaryimage\",\"url\":\"https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/Screenshot-2024-12-02-at-17.21.06.png\",\"contentUrl\":\"https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/Screenshot-2024-12-02-at-17.21.06.png\",\"width\":2078,\"height\":1148,\"caption\":\"Vis\u00e3o Frontal do Masterplan\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.portocentral.com.br\/blog\/porto-central-inicia-obras-da-fase-1-em-presidente-kennedy-es\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"In\u00edcio\",\"item\":\"https:\/\/www.portocentral.com.br\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Porto Central inicia obras da FASE 1 em Presidente Kennedy (ES)\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.portocentral.com.br\/#website\",\"url\":\"https:\/\/www.portocentral.com.br\/\",\"name\":\"Porto Central\",\"description\":\"uma inovadora solu\u00e7\u00e3o log\u00edstica\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.portocentral.com.br\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.portocentral.com.br\/#\/schema\/person\/9c74e456aa9f17c1556873d18fe8352d\",\"name\":\"Dani Klein\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.portocentral.com.br\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/2e16ed30a1d1abdde42add3583a961aa?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/2e16ed30a1d1abdde42add3583a961aa?s=96&d=mm&r=g\",\"caption\":\"Dani Klein\"},\"sameAs\":[\"http:\/\/kickgroup.com.br\"],\"url\":\"https:\/\/www.portocentral.com.br\/en\/blog\/author\/dani-klein\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Porto Central inicia obras da FASE 1 em Presidente Kennedy (ES) - Porto Central","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.portocentral.com.br\/en\/blog\/porto-central-inicia-obras-da-fase-1-em-presidente-kennedy-es\/","og_locale":"en_US","og_type":"article","og_title":"Porto Central inicia obras da FASE 1 em Presidente Kennedy (ES) - Porto Central","og_description":"O Porto Central, em Presidente Kennedy (ES), dar\u00e1 in\u00edcio \u00e0 execu\u00e7\u00e3o do projeto no pr\u00f3ximo dia 4 de dezembro de 2024. Com um investimento inicial de cerca de R$ 2,6 bilh\u00f5es e todas as licen\u00e7as ambientais emitidas pelo Instituto Brasileiro do Meio Ambiente e dos Recursos Naturais Renov\u00e1veis (Ibama) &#8211; LP 498\/2014 e LI 1436\/2023 [&hellip;]","og_url":"https:\/\/www.portocentral.com.br\/en\/blog\/porto-central-inicia-obras-da-fase-1-em-presidente-kennedy-es\/","og_site_name":"Porto Central","article_published_time":"2024-12-02T21:18:42+00:00","article_modified_time":"2024-12-03T21:15:17+00:00","og_image":[{"width":1024,"height":566,"url":"https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/Screenshot-2024-12-02-at-17.21.06-1024x566.png","type":"image\/png"}],"author":"Dani Klein","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Dani Klein","Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.portocentral.com.br\/blog\/porto-central-inicia-obras-da-fase-1-em-presidente-kennedy-es\/","url":"https:\/\/www.portocentral.com.br\/blog\/porto-central-inicia-obras-da-fase-1-em-presidente-kennedy-es\/","name":"Porto Central inicia obras da FASE 1 em Presidente Kennedy (ES) - Porto Central","isPartOf":{"@id":"https:\/\/www.portocentral.com.br\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.portocentral.com.br\/blog\/porto-central-inicia-obras-da-fase-1-em-presidente-kennedy-es\/#primaryimage"},"image":{"@id":"https:\/\/www.portocentral.com.br\/blog\/porto-central-inicia-obras-da-fase-1-em-presidente-kennedy-es\/#primaryimage"},"thumbnailUrl":"https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/Screenshot-2024-12-02-at-17.21.06.png","datePublished":"2024-12-02T21:18:42+00:00","dateModified":"2024-12-03T21:15:17+00:00","author":{"@id":"https:\/\/www.portocentral.com.br\/#\/schema\/person\/9c74e456aa9f17c1556873d18fe8352d"},"breadcrumb":{"@id":"https:\/\/www.portocentral.com.br\/blog\/porto-central-inicia-obras-da-fase-1-em-presidente-kennedy-es\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.portocentral.com.br\/blog\/porto-central-inicia-obras-da-fase-1-em-presidente-kennedy-es\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.portocentral.com.br\/blog\/porto-central-inicia-obras-da-fase-1-em-presidente-kennedy-es\/#primaryimage","url":"https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/Screenshot-2024-12-02-at-17.21.06.png","contentUrl":"https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2024\/12\/Screenshot-2024-12-02-at-17.21.06.png","width":2078,"height":1148,"caption":"Vis\u00e3o Frontal do Masterplan"},{"@type":"BreadcrumbList","@id":"https:\/\/www.portocentral.com.br\/blog\/porto-central-inicia-obras-da-fase-1-em-presidente-kennedy-es\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"In\u00edcio","item":"https:\/\/www.portocentral.com.br\/"},{"@type":"ListItem","position":2,"name":"Porto Central inicia obras da FASE 1 em Presidente Kennedy (ES)"}]},{"@type":"WebSite","@id":"https:\/\/www.portocentral.com.br\/#website","url":"https:\/\/www.portocentral.com.br\/","name":"Porto Central","description":"uma inovadora solu\u00e7\u00e3o log\u00edstica","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.portocentral.com.br\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.portocentral.com.br\/#\/schema\/person\/9c74e456aa9f17c1556873d18fe8352d","name":"Dani Klein","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.portocentral.com.br\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/2e16ed30a1d1abdde42add3583a961aa?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/2e16ed30a1d1abdde42add3583a961aa?s=96&d=mm&r=g","caption":"Dani Klein"},"sameAs":["http:\/\/kickgroup.com.br"],"url":"https:\/\/www.portocentral.com.br\/en\/blog\/author\/dani-klein\/"}]}},"_links":{"self":[{"href":"https:\/\/www.portocentral.com.br\/en\/wp-json\/wp\/v2\/posts\/12054"}],"collection":[{"href":"https:\/\/www.portocentral.com.br\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.portocentral.com.br\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.portocentral.com.br\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.portocentral.com.br\/en\/wp-json\/wp\/v2\/comments?post=12054"}],"version-history":[{"count":7,"href":"https:\/\/www.portocentral.com.br\/en\/wp-json\/wp\/v2\/posts\/12054\/revisions"}],"predecessor-version":[{"id":12073,"href":"https:\/\/www.portocentral.com.br\/en\/wp-json\/wp\/v2\/posts\/12054\/revisions\/12073"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.portocentral.com.br\/en\/wp-json\/wp\/v2\/media\/12063"}],"wp:attachment":[{"href":"https:\/\/www.portocentral.com.br\/en\/wp-json\/wp\/v2\/media?parent=12054"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.portocentral.com.br\/en\/wp-json\/wp\/v2\/categories?post=12054"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.portocentral.com.br\/en\/wp-json\/wp\/v2\/tags?post=12054"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}