{"id":12551,"date":"2025-06-02T18:15:33","date_gmt":"2025-06-02T21:15:33","guid":{"rendered":"https:\/\/www.portocentral.com.br\/?p=12551"},"modified":"2025-06-03T10:03:00","modified_gmt":"2025-06-03T13:03:00","slug":"porto-central-avanca-nas-obras-com-preparacao-de-pedreira-para-construcao-do-quebra-mar-sul","status":"publish","type":"post","link":"https:\/\/www.portocentral.com.br\/en\/blog\/porto-central-avanca-nas-obras-com-preparacao-de-pedreira-para-construcao-do-quebra-mar-sul\/","title":{"rendered":"Porto Central advances construction works with quarry preparation to supply rocks for the southern breakwater construction"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">The construction of Porto Central, the largest private deep-water port under development in Brazil, located in Presidente Kennedy (Esp\u00edrito Santo), is progressing steadily. Preparations have begun at the quarry that will supply rock materials for the construction of the southern breakwater, an essential structure to ensure protection for future port operations.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">In parallel with the land clearing for Phase 1, environmental actions were carried out to maintain and expand the seedling nursery, plant native species in the forest compensation areas, and rescue and manage local wildlife. These activities, conducted by specialized technical teams and under the supervision of the environmental authority, continue to be executed throughout subsequent construction phases.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The organic material resulting from vegetation suppression was shredded on site and mixed with the upper layer of soil (topsoil). The biomass and topsoil are now being transported to compensation areas, where they are used for soil recovery and vegetation coverage. Over 15,000 native seedlings have already been planted, with a target of 100,000 by the end of Phase 1.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Located 27 kilometers from the port site, the quarry is in its final preparation stage before beginning the extraction and transport of rocks to the breakwater construction site. The activity follows a detailed logistics plan with environmental controls in place.<\/span><\/p>\n<p><span style=\"font-weight: 400;\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter wp-image-12569 size-full\" src=\"http:\/\/www.portocentral.com.br\/wp-content\/uploads\/2025\/06\/Pedreira-Porto-Junho2025.jpeg\" alt=\"\" width=\"600\" height=\"450\" srcset=\"https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2025\/06\/Pedreira-Porto-Junho2025.jpeg 600w, https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2025\/06\/Pedreira-Porto-Junho2025-463x348.jpeg 463w, https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2025\/06\/Pedreira-Porto-Junho2025-400x300.jpeg 400w, https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2025\/06\/Pedreira-Porto-Junho2025-367x275.jpeg 367w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/span><\/p>\n<p><span style=\"font-weight: 400;\">The next stages of construction include earthworks, installation of the construction site facilities, assembly of the concrete element fabrication plant, and dredging of the port\u2019s access channel.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><b>About Porto Central<\/b><\/p>\n<p><span style=\"font-weight: 400;\">The full industrial port complex will cover an area of 2,000 hectares, with a depth of up to 25 meters and 54 planned berths. It will be capable of handling a wide range of cargo segments, including liquid and solid bulk, fertilizers, minerals, grains, containers, general cargo, natural gas, offshore support services, and shipbuilding.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Porto Central will be developed in phases according to market demand. Phase 1 includes the construction of a deep-water liquid bulk terminal dedicated to ship-to-ship (STS) oil transshipment, with operations scheduled to begin in 2027.<\/span><\/p>\n<div style=\"position: relative; padding-bottom: 56.25%; height: 0; overflow: hidden; width: 100%; max-width: 100%;\"><iframe style=\"position: absolute; top: 0; left: 0; width: 100%; height: 100%;\" src=\"https:\/\/www.youtube.com\/embed\/S7BLXCmv3VI\" frameborder=\"0\" allowfullscreen=\"allowfullscreen\"><br \/>\n<\/iframe><\/div>","protected":false},"excerpt":{"rendered":"<p>As obras de implanta\u00e7\u00e3o do maior porto privado de \u00e1guas profundas em constru\u00e7\u00e3o no Brasil, o Porto Central, em Presidente Kennedy (ES), avan\u00e7am e foi iniciada a prepara\u00e7\u00e3o da pedreira que fornecer\u00e1 as rochas para o quebra-mar sul, estrutura fundamental para garantir a prote\u00e7\u00e3o das futuras opera\u00e7\u00f5es portu\u00e1rias.\u00a0 Paralelamente \u00e0 limpeza do terreno da Fase [&hellip;]<\/p>","protected":false},"author":2,"featured_media":12553,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[61,3],"tags":[95,94,99,56,57,101],"acf":[],"featured_image_src":{"landsacpe":["https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2025\/06\/PORTO2025_trituracao_topsoil-1140x445.jpeg",1140,445,true],"list":["https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2025\/06\/PORTO2025_trituracao_topsoil-463x348.jpeg",463,348,true],"medium":["https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2025\/06\/PORTO2025_trituracao_topsoil-300x225.jpeg",300,225,true],"full":["https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2025\/06\/PORTO2025_trituracao_topsoil.jpeg",1280,960,false]},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v22.4 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Porto Central avan\u00e7a nas obras com prepara\u00e7\u00e3o de pedreira para constru\u00e7\u00e3o do quebra-mar sul - Porto Central<\/title>\n<meta name=\"description\" content=\"Prepara\u00e7\u00e3o da pedreira que vai fornecer as rochas para o quebra-mar sul do Porto Central \u00e9 iniciada, estrutura essencial para proteger as futuras opera\u00e7\u00f5es portu\u00e1rias.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.portocentral.com.br\/en\/blog\/porto-central-avanca-nas-obras-com-preparacao-de-pedreira-para-construcao-do-quebra-mar-sul\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Porto Central avan\u00e7a nas obras com prepara\u00e7\u00e3o de pedreira para constru\u00e7\u00e3o do quebra-mar sul - Porto Central\" \/>\n<meta property=\"og:description\" content=\"Prepara\u00e7\u00e3o da pedreira que vai fornecer as rochas para o quebra-mar sul do Porto Central \u00e9 iniciada, estrutura essencial para proteger as futuras opera\u00e7\u00f5es portu\u00e1rias.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.portocentral.com.br\/en\/blog\/porto-central-avanca-nas-obras-com-preparacao-de-pedreira-para-construcao-do-quebra-mar-sul\/\" \/>\n<meta property=\"og:site_name\" content=\"Porto Central\" \/>\n<meta property=\"article:published_time\" content=\"2025-06-02T21:15:33+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-06-03T13:03:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2025\/06\/PORTO2025_trituracao_topsoil.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"960\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Dani Klein\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Dani Klein\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.portocentral.com.br\/blog\/porto-central-avanca-nas-obras-com-preparacao-de-pedreira-para-construcao-do-quebra-mar-sul\/\",\"url\":\"https:\/\/www.portocentral.com.br\/blog\/porto-central-avanca-nas-obras-com-preparacao-de-pedreira-para-construcao-do-quebra-mar-sul\/\",\"name\":\"Porto Central avan\u00e7a nas obras com prepara\u00e7\u00e3o de pedreira para constru\u00e7\u00e3o do quebra-mar sul - Porto Central\",\"isPartOf\":{\"@id\":\"https:\/\/www.portocentral.com.br\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.portocentral.com.br\/blog\/porto-central-avanca-nas-obras-com-preparacao-de-pedreira-para-construcao-do-quebra-mar-sul\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.portocentral.com.br\/blog\/porto-central-avanca-nas-obras-com-preparacao-de-pedreira-para-construcao-do-quebra-mar-sul\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2025\/06\/PORTO2025_trituracao_topsoil.jpeg\",\"datePublished\":\"2025-06-02T21:15:33+00:00\",\"dateModified\":\"2025-06-03T13:03:00+00:00\",\"author\":{\"@id\":\"https:\/\/www.portocentral.com.br\/#\/schema\/person\/9c74e456aa9f17c1556873d18fe8352d\"},\"description\":\"Prepara\u00e7\u00e3o da pedreira que vai fornecer as rochas para o quebra-mar sul do Porto Central \u00e9 iniciada, estrutura essencial para proteger as futuras opera\u00e7\u00f5es portu\u00e1rias.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.portocentral.com.br\/blog\/porto-central-avanca-nas-obras-com-preparacao-de-pedreira-para-construcao-do-quebra-mar-sul\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.portocentral.com.br\/blog\/porto-central-avanca-nas-obras-com-preparacao-de-pedreira-para-construcao-do-quebra-mar-sul\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.portocentral.com.br\/blog\/porto-central-avanca-nas-obras-com-preparacao-de-pedreira-para-construcao-do-quebra-mar-sul\/#primaryimage\",\"url\":\"https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2025\/06\/PORTO2025_trituracao_topsoil.jpeg\",\"contentUrl\":\"https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2025\/06\/PORTO2025_trituracao_topsoil.jpeg\",\"width\":1280,\"height\":960},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.portocentral.com.br\/blog\/porto-central-avanca-nas-obras-com-preparacao-de-pedreira-para-construcao-do-quebra-mar-sul\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"In\u00edcio\",\"item\":\"https:\/\/www.portocentral.com.br\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Porto Central avan\u00e7a nas obras com prepara\u00e7\u00e3o de pedreira para constru\u00e7\u00e3o do quebra-mar sul\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.portocentral.com.br\/#website\",\"url\":\"https:\/\/www.portocentral.com.br\/\",\"name\":\"Porto Central - Complexo Industrial Portu\u00e1rio de \u00c1guas Profundas\",\"description\":\"Porto Central \u00e9 um complexo industrial portu\u00e1rio multiprop\u00f3sito em desenvolvimento no Esp\u00edrito Santo. Hub global para petr\u00f3leo, g\u00e1s, agroneg\u00f3cio, cont\u00eainer, energia renov\u00e1vel e offshore.\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.portocentral.com.br\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.portocentral.com.br\/#\/schema\/person\/9c74e456aa9f17c1556873d18fe8352d\",\"name\":\"Dani Klein\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.portocentral.com.br\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/2e16ed30a1d1abdde42add3583a961aa?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/2e16ed30a1d1abdde42add3583a961aa?s=96&d=mm&r=g\",\"caption\":\"Dani Klein\"},\"sameAs\":[\"http:\/\/kickgroup.com.br\"],\"url\":\"https:\/\/www.portocentral.com.br\/en\/blog\/author\/dani-klein\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Porto Central avan\u00e7a nas obras com prepara\u00e7\u00e3o de pedreira para constru\u00e7\u00e3o do quebra-mar sul - Porto Central","description":"Prepara\u00e7\u00e3o da pedreira que vai fornecer as rochas para o quebra-mar sul do Porto Central \u00e9 iniciada, estrutura essencial para proteger as futuras opera\u00e7\u00f5es portu\u00e1rias.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.portocentral.com.br\/en\/blog\/porto-central-avanca-nas-obras-com-preparacao-de-pedreira-para-construcao-do-quebra-mar-sul\/","og_locale":"en_US","og_type":"article","og_title":"Porto Central avan\u00e7a nas obras com prepara\u00e7\u00e3o de pedreira para constru\u00e7\u00e3o do quebra-mar sul - Porto Central","og_description":"Prepara\u00e7\u00e3o da pedreira que vai fornecer as rochas para o quebra-mar sul do Porto Central \u00e9 iniciada, estrutura essencial para proteger as futuras opera\u00e7\u00f5es portu\u00e1rias.","og_url":"https:\/\/www.portocentral.com.br\/en\/blog\/porto-central-avanca-nas-obras-com-preparacao-de-pedreira-para-construcao-do-quebra-mar-sul\/","og_site_name":"Porto Central","article_published_time":"2025-06-02T21:15:33+00:00","article_modified_time":"2025-06-03T13:03:00+00:00","og_image":[{"width":1280,"height":960,"url":"https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2025\/06\/PORTO2025_trituracao_topsoil.jpeg","type":"image\/jpeg"}],"author":"Dani Klein","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Dani Klein","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.portocentral.com.br\/blog\/porto-central-avanca-nas-obras-com-preparacao-de-pedreira-para-construcao-do-quebra-mar-sul\/","url":"https:\/\/www.portocentral.com.br\/blog\/porto-central-avanca-nas-obras-com-preparacao-de-pedreira-para-construcao-do-quebra-mar-sul\/","name":"Porto Central avan\u00e7a nas obras com prepara\u00e7\u00e3o de pedreira para constru\u00e7\u00e3o do quebra-mar sul - Porto Central","isPartOf":{"@id":"https:\/\/www.portocentral.com.br\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.portocentral.com.br\/blog\/porto-central-avanca-nas-obras-com-preparacao-de-pedreira-para-construcao-do-quebra-mar-sul\/#primaryimage"},"image":{"@id":"https:\/\/www.portocentral.com.br\/blog\/porto-central-avanca-nas-obras-com-preparacao-de-pedreira-para-construcao-do-quebra-mar-sul\/#primaryimage"},"thumbnailUrl":"https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2025\/06\/PORTO2025_trituracao_topsoil.jpeg","datePublished":"2025-06-02T21:15:33+00:00","dateModified":"2025-06-03T13:03:00+00:00","author":{"@id":"https:\/\/www.portocentral.com.br\/#\/schema\/person\/9c74e456aa9f17c1556873d18fe8352d"},"description":"Prepara\u00e7\u00e3o da pedreira que vai fornecer as rochas para o quebra-mar sul do Porto Central \u00e9 iniciada, estrutura essencial para proteger as futuras opera\u00e7\u00f5es portu\u00e1rias.","breadcrumb":{"@id":"https:\/\/www.portocentral.com.br\/blog\/porto-central-avanca-nas-obras-com-preparacao-de-pedreira-para-construcao-do-quebra-mar-sul\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.portocentral.com.br\/blog\/porto-central-avanca-nas-obras-com-preparacao-de-pedreira-para-construcao-do-quebra-mar-sul\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.portocentral.com.br\/blog\/porto-central-avanca-nas-obras-com-preparacao-de-pedreira-para-construcao-do-quebra-mar-sul\/#primaryimage","url":"https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2025\/06\/PORTO2025_trituracao_topsoil.jpeg","contentUrl":"https:\/\/www.portocentral.com.br\/wp-content\/uploads\/2025\/06\/PORTO2025_trituracao_topsoil.jpeg","width":1280,"height":960},{"@type":"BreadcrumbList","@id":"https:\/\/www.portocentral.com.br\/blog\/porto-central-avanca-nas-obras-com-preparacao-de-pedreira-para-construcao-do-quebra-mar-sul\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"In\u00edcio","item":"https:\/\/www.portocentral.com.br\/"},{"@type":"ListItem","position":2,"name":"Porto Central avan\u00e7a nas obras com prepara\u00e7\u00e3o de pedreira para constru\u00e7\u00e3o do quebra-mar sul"}]},{"@type":"WebSite","@id":"https:\/\/www.portocentral.com.br\/#website","url":"https:\/\/www.portocentral.com.br\/","name":"Porto Central - Complexo Industrial Portu\u00e1rio de \u00c1guas Profundas","description":"Porto Central \u00e9 um complexo industrial portu\u00e1rio multiprop\u00f3sito em desenvolvimento no Esp\u00edrito Santo. Hub global para petr\u00f3leo, g\u00e1s, agroneg\u00f3cio, cont\u00eainer, energia renov\u00e1vel e offshore.","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.portocentral.com.br\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.portocentral.com.br\/#\/schema\/person\/9c74e456aa9f17c1556873d18fe8352d","name":"Dani Klein","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.portocentral.com.br\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/2e16ed30a1d1abdde42add3583a961aa?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/2e16ed30a1d1abdde42add3583a961aa?s=96&d=mm&r=g","caption":"Dani Klein"},"sameAs":["http:\/\/kickgroup.com.br"],"url":"https:\/\/www.portocentral.com.br\/en\/blog\/author\/dani-klein\/"}]}},"_links":{"self":[{"href":"https:\/\/www.portocentral.com.br\/en\/wp-json\/wp\/v2\/posts\/12551"}],"collection":[{"href":"https:\/\/www.portocentral.com.br\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.portocentral.com.br\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.portocentral.com.br\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.portocentral.com.br\/en\/wp-json\/wp\/v2\/comments?post=12551"}],"version-history":[{"count":15,"href":"https:\/\/www.portocentral.com.br\/en\/wp-json\/wp\/v2\/posts\/12551\/revisions"}],"predecessor-version":[{"id":12570,"href":"https:\/\/www.portocentral.com.br\/en\/wp-json\/wp\/v2\/posts\/12551\/revisions\/12570"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.portocentral.com.br\/en\/wp-json\/wp\/v2\/media\/12553"}],"wp:attachment":[{"href":"https:\/\/www.portocentral.com.br\/en\/wp-json\/wp\/v2\/media?parent=12551"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.portocentral.com.br\/en\/wp-json\/wp\/v2\/categories?post=12551"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.portocentral.com.br\/en\/wp-json\/wp\/v2\/tags?post=12551"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}